Before you call anyone, spend 24 hours and one bucket finding out whether you have a leak at all. Most reported leaks on a new concrete or fibreglass pool are evaporation, and the test that separates them costs nothing.
Do the bucket test before you call anyone or pay for leak detection. An uncovered Australian pool loses around 7mm of water a day through summer to evaporation alone, so a falling level proves nothing. If the pool drops more than a bucket standing in it over 24 hours, you have a leak — and on a new concrete or fibreglass shell that is a defect, with a 6 year 6 month rectification window in Queensland.
The short answer
- Evaporation is the usual answer. SPASA puts an uncovered pool at around 7mm a day over summer, at no cost to anyone but your water bill.
- The bucket test compares the pool against a bucket in the same weather, so it needs no threshold, no inspection and no equipment.
- Run it twice — once with the filtration pump running, once with it off. Loss only when the pump runs points at the plumbing, not the concrete shell.
- A leaking shell is treated as a structural defect in Queensland, and the QBCC gives cracks in a pool shell as an example of defective work.
- That matters for deadlines: structural gets years, non-structural gets 12 months from completion. Do not sit on it.
| Result over 24 hours | What it means | What to do next |
|---|---|---|
| Pool and bucket drop by the same amount | Evaporation. Normal, and worse in wind, heat and low humidity | Nothing. A cover cuts evaporation by 90–95% |
| Pool drops noticeably more than the bucket, pump running and off | A leak in the shell, the fittings or the structure | Report it to the builder in writing, dated, with the test result |
| Pool drops more only when the pump is running | Pressure-side plumbing or a return line | Report it — but say so, because it changes what gets dug up |
| Pool drops more only when the pump is off | Suction-side plumbing, skimmer or main drain | Report it with the same detail |
| Wet patch, sinking paving or soft ground beside the pool | Possible underground line or shell leak | Report immediately, photograph it, and stop topping up so the level can be read |
First, prove there is a leak. It takes a bucket and 24 hours
The bucket test is the standard method leak-detection services use, and the reason it works is that it removes the guesswork about weather. Fill a bucket with pool water, stand it on a step so it is partly submerged and at the same temperature, mark the water level inside the bucket and the pool level outside it, and come back in 24 hours with the pump and any water features off.
Both levels will have dropped, because both are evaporating in the same air. If the pool has dropped further than the bucket, the difference is your leak. If they match, you do not have one.
Then run it again with the pump on its normal cycle. Comparing the two results is what tells a plumber where to look, and arriving with that answer already in hand is what keeps an investigation from becoming an excavation.
Do not top the pool up during the test, and do not run it in rain.
Why the number on its own means nothing
Owners regularly report a "leak" of a few centimetres a week that turns out to be an ordinary Australian summer. SPASA puts an uncovered average backyard pool at around 7mm of water a day through the summer months — roughly 5cm a week, from evaporation alone, with nothing wrong at all.
Evaporation is driven by wind, water temperature, humidity and sun, so it swings day to day and pool to pool. That is exactly why an absolute threshold — "more than X mm a day is a leak" — is unreliable advice, and why the bucket test is the right method: it measures your pool against your weather on your day.
For scale, a pool cover reduces evaporation by 90–95%, saving about 3,000 litres a month. If your only complaint is the top-up bill rather than a suspected fault, that is the fix. See what a pool costs to run per year.
If it is a leak on a new pool, it is a defect — treat it as one
On a pool that is months rather than decades old, a genuine leak is defective building work, not maintenance. The QBCC gives cracks in a pool shell that let water leak through the concrete as an example of defective building work, and leaking is treated in the structural category rather than the cosmetic one.
That classification is worth more than it sounds, because the deadlines differ enormously. In Queensland a direction to rectify may be issued within 6 years and 6 months of the work being completed for a structural defect, but the QBCC will only consider one within 12 months of completion for a non-structural defect. A request for a direction should be made within 12 months of you becoming aware of the problem.
So: report it in writing the day the bucket test comes back positive, with the test result and photographs, and keep the dated email. What to do when the builder does not fix the defects covers the escalation path and the deadline table.
What not to do while you are waiting
Do not empty the pool. A drained concrete shell can float or crack in wet ground, and a fibreglass shell can distort. If someone tells you to drain it to find the leak, ask them to put the advice and the responsibility in writing first.
Do not seal anything yourself before the builder has inspected. A patched crack is harder to attribute later, and attribution is the whole argument.
Do keep the water balanced and keep topping up outside the test window — an unbalanced pool gives a builder an argument about cause, and a barrier around a pool nobody is maintaining is still your obligation. If the pool is unusable and you are weighing rectification against replacement, get independent quotes: free pool quotes and what should be in a pool quote.
Common questions
How much water loss is normal for an Australian pool?
Is a leaking pool shell covered by the builder?
Should I call a leak detection service or the builder first?
Can I do the bucket test on a pool with an automatic top-up?
Sources
- SPASA — Pool water savings techniques
- QBCC — Rectification of Building Work Regulatory Guide
- QBCC — Direction to rectify
General information only, current at 2026-09-10. Pool rules differ by state and by council, and penalty amounts are updated regularly. Confirm your own obligations with your council or a registered inspector before acting.
Thinking about a pool?
Compare quotes from builders who work in your postcode. One form, no obligation.
Get my quotes