The surround is where pool budgets break, because it is usually a separate contract from the pool and it is priced in units that do not compare to each other. It also carries a compliance consequence no landscaping quote mentions: anything built against the barrier becomes the level the 1200mm is measured from, and objects must be set back 500mm. That is the commonest way a compliant pool fence becomes non-compliant, and it happens after the final inspection has already passed.

Updated 2026-09-22 3 sources cited

Published Australian rates: paving roughly $60–$160 per square metre, turf $15–$40, artificial turf $70–$90, retaining walls $200–$500 per square metre of wall face. Whole-of-yard landscaping is published at $50–$150/m² for basic work and $200–$550+ once structures are involved.

The short answer

  • Published element rates: paving about $60–$160/m², turf $15–$40/m², artificial turf around $70–$90/m² supplied and laid, retaining walls $200–$500 per square metre of wall face. All vendor-published.
  • Whole-of-project rates are much wider: roughly $50–$150/m² for basic landscaping and $200–$550 or more per square metre once paving, retaining and structures are involved.
  • The surround is usually a separate contract. The pool contract typically ends at the shell, the plant and the water, which is why the surround appears as post-contract cost rather than as part of the price you compared.
  • The compliance trap: anything abutting the barrier becomes the finished ground level, so the 1200mm is measured from it. A 200mm step against the fence leaves a 1000mm barrier.
  • The Standard's own remedy is a setback: steps, objects and level changes must be set back a minimum of 500mm from the barrier. Designing to that from the start costs nothing.
Landscaping around a pool: published rates by element, and what moves them
ElementPublished Australian rateUnitWhat moves it
Paving$60–$160 (Victoria published at $80–$200; Perth $70–$170 laid)per m²Material, cutting around a curved pool, substrate and falls
Pavers, supply$40–$65per m²Supply only — not comparable to a laid rate
Turf, supplied and laid$15–$40 (VIC published at $25–$50)per m²Variety, soil preparation, access
Artificial turf, supplied and laid$70–$90per m²Pile, base preparation, edging
Retaining walls$200–$500 (blocks alone $130–$250)per m² of wall faceHeight, engineering, drainage, whether a permit is required
Basic landscaping, whole project$50–$150per m²Scope. Useful only for a first pass
Landscaping with paving, retaining and structures$200–$550+per m²This is the band most finished pool surrounds land in
The compliance item——Objects must be set back 500mm from the barrier

Why the surround is the part that surprises people

Three structural reasons, and none of them is anybody behaving badly.

It is a different contract. A pool contract typically covers the shell, the excavation, the plant and the water. Coping, paving, drainage, retaining, turf and planting are frequently quoted by a landscaper engaged afterwards. So the price you compared between builders was never the price of a finished backyard. Our page on pool coping cost covers the element that sits exactly on the seam between the two contracts.

It is priced in incompatible units. Paving and turf are sold per square metre, coping per linear metre, retaining per square metre of wall face, and excavation per cubic metre or by the day. Two landscaping quotes for the same yard can look wildly different because they are measuring different things.

It is the last thing done, so it absorbs everything that ran over earlier and it is quoted at the point when the budget has least room.

The quotable version: the pool has a price and the backyard has a cost, and they are usually agreed months apart.

The published element rates above are the raw material for a sensible estimate; what a pool deck costs and pool landscaping ideas cover the design side of the same decisions.

The compliance trap that makes a passed inspection fail later

This is the part a landscaping quote will not mention, because it is a building rule rather than a landscaping one.

VBA Practice Note 05-2018 states: ‘A step, object or level change that abuts the fence is considered to be the finished ground level and therefore the 1200 mm must be measured to this point.’ And: ‘Clause 2.3.1 of the Standard requires that steps, objects or level changes must be set back a minimum of 500 mm from the barrier.’

Follow the sequence that produces the failure:

  1. The pool is built, the barrier is installed at 1200mm, and it passes inspection.
  2. Months later a landscaper lays a paved step, a planter box, a retaining course or a raised garden bed against the fence line, because that is where the edge of the design naturally falls.
  3. The top of that object becomes the finished ground level. The barrier is now 1200mm minus the height of the object.
  4. Nobody inspects anything, because the landscaping was not building work anybody notified.
  5. The failure surfaces at the next compliance certificate, at sale, or worse.

The quotable version: landscaping is the commonest way a compliant pool fence becomes non-compliant, and it happens after the inspection that said it was fine.

The prevention costs nothing at design stage: hold everything back 500mm from the barrier and the problem never arises. The cure costs real money — see what it costs to raise a pool fence, and the non-climbable zone explained for the related requirement about what can sit near a barrier.

A worked example, so you can substitute your own numbers

Take a rectangular pool with a 30m perimeter in a backyard with 90m² of usable surround, on a block with a modest fall.

  • Paving, 45m² at $110/m² (mid of the published $60–$160 band) = $4,950
  • Turf, 45m² at $28/m² = $1,260
  • Retaining, 12m² of wall face at $300/m² = $3,600
  • Subtotal: $9,810, before coping, drainage, planting, lighting, irrigation and site preparation

Now compare that against the whole-project published band. At $200–$550/m² for landscaping involving paving, retaining and structures, 90m² gives $18,000–$49,500.

The gap between those two calculations is the point of this section. Element rates cover the materials and the laying. The project band covers everything the element rates exclude: site preparation, spoil, drainage, edging, levels, access, planting, lighting, irrigation, and the making-good that follows a pool build. If your estimate is built from element rates alone, expect it to be low by a factor that grows with how much the levels have to change.

Substitute your own areas into the same two calculations and use the difference as your contingency rather than as a shock. And note that every figure here is vendor-published: there is no regulated rate for landscaping in Australia and no independent survey we could find.

How to get a comparable landscaping quote

The single highest-value thing you can do is make the quotes measure the same yard.

Ask forWhy
Areas and lengths stated — m² of paving, m² of turf, m² of wall face, linear metres of copingWithout the quantities, a total is not comparable to another total
Supply-and-lay rates, not supply-onlyA $45/m² paver rate against a $110/m² laid rate is not a saving
Site preparation and spoil removal named separatelyThe commonest exclusion, and the commonest overrun
Drainage and fallsA pool surround that does not drain is a problem you pay for twice
The 500mm setback shown on the planThe compliance item above. Get it drawn, not promised
Who is responsible if the barrier fails afterwardsAsk before, because nobody volunteers it after

The one question worth asking every landscaper in the same words: “Does anything in this design sit within 500mm of the pool barrier, and if so, what happens to the barrier's compliance?” A landscaper who answers it well is worth paying more.

If the surround is being planned alongside the pool rather than after it, you can get a quote that names the surround explicitly, and what differs between pool quotes sets out the inclusions worth lining up.

Common questions

How much does landscaping around a pool cost in Australia?
Published element rates are roughly $60 to $160 per square metre for paving, $15 to $40 for turf supplied and laid, around $70 to $90 for artificial turf, and $200 to $500 per square metre of wall face for retaining. Whole-project landscaping involving paving, retaining and structures is published at roughly $200 to $550 or more per square metre. These are vendor-published figures with no regulated rate or independent survey behind them.
Is landscaping included in a pool contract?
Usually not. A pool contract typically covers the shell, excavation, plant and water, while coping, paving, drainage, retaining, turf and planting are frequently quoted separately, often by a landscaper engaged after the pool is in. That split is normal and often cheaper, but it means the pool price you compared between builders was never the price of a finished backyard.
Can landscaping make my pool fence non-compliant?
Yes, and it is the most common way it happens. VBA Practice Note 05-2018 states that a step, object or level change abutting the fence is considered to be the finished ground level, so the 1200mm barrier height is measured from that point. Clause 2.3.1 of the Standard requires steps, objects and level changes to be set back a minimum of 500mm from the barrier.
Why do landscaping quotes vary so much?
Mostly because they are not measuring the same thing. Paving and turf are priced per square metre, coping per linear metre, retaining per square metre of wall face, and site works by volume or by the day. Supply-only rates also sit alongside supply-and-lay rates in the same market. Ask every quote to state its quantities and its units and the spread usually narrows considerably.
What is the cheapest way to finish around a pool?
Turf is the lowest published rate per square metre, and minimising level changes is the biggest single saving because retaining and the earthworks behind it are the most expensive elements. Keeping everything at least 500mm clear of the barrier also avoids a compliance cost later, which is a saving that does not appear on any quote.

Sources

General information only, current at 2026-09-22. Pool rules differ by state and by council, and penalty amounts are updated regularly. Confirm your own obligations with your council or a registered inspector before acting.

Thinking about a pool?

Compare quotes from builders who work in your postcode. One form, no obligation.

Get my quotes