Can my neighbour object to my pool?

Both sides of this question usually overestimate the neighbour's role. In Victoria the adjoining owner has a defined statutory role in protection work only: agree, disagree, or ask for more information, within 14 days, with silence treated as agreement. In NSW a pool approved as complying development carries a notification requirement but no objection right. Queensland depends on the assessment type, and the fencing notice is a separate mechanism again. Council approval, the barrier and the permit sit underneath all of it.

Updated 2026-09-22 3 sources cited

Less than most people assume. In Victoria an adjoining owner has 14 days to agree, disagree or seek more information about protection work — and failing to respond is taken to be agreement. If they disagree, the building surveyor determines it and is not required to give any person a hearing.

The short answer

  • Victoria: the role is confined to protection work. Building Act 1993 sections 84 to 87 give the adjoining owner a notice, 14 days to respond, and three options — agree, disagree, or require more information.
  • Silence is agreement. Section 85(2): an adjoining owner who fails to give a notice within the required time is taken to have agreed to the proposed protection work.
  • Disagreement goes to the building surveyor, not to a hearing. Section 87(3) says the relevant building surveyor may make any inquiries he or she thinks fit but is not required to give any person a hearing.
  • NSW complying development: notification without objection. At least 7 days notice must be given to the occupier of each dwelling with a boundary within 20m, but neighbours cannot lodge objections to the certificate.
  • A dividing fence used as a pool barrier is a separate process with its own notice period, run under neighbourhood dispute legislation rather than planning law.
What a neighbour can and cannot do, by state and approval pathway
Jurisdiction / pathwayAre they notified?Can they formally object?Who decides
Victoria — protection work (Building Act ss 84-87)Yes, by notice of proposed building workLimited: agree, disagree, or require more information, within 14 daysThe relevant building surveyor determines appropriateness; no hearing required
Victoria — no protection work proposedNot under this PartNo role under Part 7Relevant building surveyor, via the building permit
Victoria — access to plans (s 92)On request—The surveyor must make plans available for inspection without charge
NSW — complying developmentYes: at least 7 days notice to dwellings with a boundary within 20mNo. Notification is advisory; objections cannot be lodged against the certificateThe certifier, against the code standards
NSW — development applicationPer the council's notification policyYes, by submissionThe council, weighing submissions
QLD — code assessableGenerally not publicly notifiedNo formal submission rightThe assessment manager
QLD — impact assessableYes, public notification periodYes, by properly made submissionThe assessment manager, with appeal rights
Dividing fence as pool barrierYes, by notice of proposed fencing workBy applying to the tribunal, not by objecting to the poolThe tribunal, on a fencing application

Victoria: the neighbour's role is narrower than almost anyone expects

Part 7 of the Building Act 1993 is titled Protection of adjoining property, and that title is the boundary of the role. It is not a general right to object to your pool. It is a process about whether the work you propose to do to protect their property is appropriate.

Section 84 requires notice of building work to be given. Section 85(1) then gives the adjoining owner, ‘not later than 14 days after service’ of the notice, exactly three options: give a notice agreeing to the proposed protection work; give a notice disagreeing with it; or give a notice requiring more information to enable the proposal to be considered by the relevant building surveyor.

Section 85(2) is the one that surprises people on both sides: an adjoining owner who fails to give a notice within the required time ‘is taken to have agreed to the proposed protection work’. Silence is not a holding position. It is consent.

If the adjoining owner does disagree, section 87 sends the matter to the relevant building surveyor, who must examine the proposal and determine its appropriateness. Section 87(3) then states that in determining the matter the surveyor ‘may make any inquiries he or she thinks fit but is not required to give any person a hearing’. Both owners must be given written notice of the determination.

The quotable version: in Victoria a neighbour gets a say about protection work, a deadline, and a determination — not a hearing and not a veto.

Our page on what protection work is on a pool build explains when it is triggered in the first place, which for pools is usually excavation close to a boundary.

What a neighbour can always do: look at the plans

Section 92 of the Building Act is short and worth knowing, because it is the provision most likely to be exercised.

It provides that at any time after notice of intention to commence building work has been given under that Part, the relevant building surveyor ‘must make available to the adjoining owner, on request, for inspection, without charge, any plans, drawings and specifications of the proposed building work’ in the surveyor's possession or control.

Two practical consequences:

  • For the owner building the pool: assume the plans will be seen. That is a reason to have them right, not a reason to be defensive.
  • For the adjoining owner: inspection is free and does not require a dispute. Asking to see the plans is not an objection and does not start one.

There is also an insurance provision sitting alongside. Section 93 requires the owner, before any protection work is commenced in respect of an adjoining property, to ensure a contract of insurance is in force against damage by the proposed protection work to the adjoining property and liabilities likely to be incurred to adjoining occupiers. That, rather than an objection right, is what actually protects the neighbour.

NSW: notified, but with no objection right on a complying development

NSW produces the outcome people find hardest to accept, because the neighbour receives a letter that looks like a consultation and is not one.

Many residential pools proceed as complying development, a fast-track pathway where a certifier checks the proposal against fixed standards. The NSW Planning Portal states the pool standard plainly: ‘The swimming pool waterline must be set back at least 1 metre from a side or rear boundary.’

On notification, the position is that the person with the benefit of the certificate must give at least 7 days notice of the intention to commence construction work to the occupier of each dwelling lot with a boundary within 20m of the development — and that these notification requirements are advisory; neighbours cannot lodge objections to the complying development certificate. There is also no right of appeal against the determination of, or a refusal to determine, an application for one.

The quotable version: in NSW a complying development notice tells your neighbour what is about to happen, not what they can stop.

Where a pool cannot meet the complying development standards, it goes to the council as a development application instead, and then the council's notification policy and submission rights apply. That is the route where an objection has somewhere to go. Our page on whether a pool needs council approval covers which pathway applies, and what to do if a council rejects a pool application covers the other side of it.

Queensland, and the fencing mechanism that applies everywhere

Queensland turns on the assessment category. Code-assessable development does not carry formal objection rights, although members of the public can still write to the local government and lobby councillors. Impact-assessable development does: the Development Assessment Rules provide a public notification period and a formal procedure for making a submission. Most domestic pools are dealt with as building work through a private certifier rather than as impact-assessable development, which is why the objection question usually does not arise.

Separately, and often confused with objecting to the pool, is the dividing fence. Where a boundary fence is to form part of a pool barrier, neighbourhood dispute legislation provides a notice of proposed fencing work — in Queensland, Form 39 — and a period during which the adjoining owner may apply to the tribunal. The neighbour's remedy there is an application about the fence, not an objection to the pool.

That distinction is the single most useful thing to hold onto in a neighbour dispute: the fence and the pool are different proceedings, with different decision-makers and different deadlines. Our page on whether a boundary fence can be the pool barrier covers the technical side of using a dividing fence as a barrier.

If a neighbour has raised a concern and you are not sure whether it has any formal standing, the fastest way to find out is to ask the council or the certifier which pathway your approval is on. And if you are still at the planning stage, get a quote that names the approval pathway and any protection work, so the question is answered before a notice arrives.

Common questions

Can a neighbour stop me building a pool?
Rarely, and it depends entirely on the approval pathway. On a NSW complying development certificate, neighbours are notified but cannot lodge objections and there is no right of appeal. In Victoria, an adjoining owner's statutory role under Part 7 of the Building Act is confined to protection work. Where a pool needs a development application, a neighbour can make a submission that the council must consider.
How long does my neighbour have to respond in Victoria?
Section 85(1) of the Building Act 1993 gives the adjoining owner until not later than 14 days after service of the notice of proposed building work. Section 85(2) provides that an adjoining owner who fails to give a notice within the required time is taken to have agreed to the proposed protection work. The response options are to agree, to disagree, or to require more information.
Can my neighbour see my pool plans?
In Victoria, yes. Section 92 of the Building Act 1993 requires the relevant building surveyor, at any time after notice of intention to commence building work has been given under that Part, to make available to the adjoining owner on request, for inspection and without charge, any plans, drawings and specifications of the proposed building work in the surveyor's possession or control.
What happens if my neighbour disagrees with the protection work?
Under section 87, the relevant building surveyor must examine the proposal and determine whether the protection work is appropriate. The surveyor may make any inquiries they think fit but is not required to give any person a hearing, and must give both the owner and the adjoining owner written notice of the determination. There are separate appeal avenues to the Building Appeals Board in defined circumstances.
My neighbour objects to the fence being used as a pool barrier. What now?
That is a fencing matter rather than a pool approval matter, and it runs under neighbourhood dispute legislation with its own notice of proposed fencing work and its own tribunal. Keeping the two separate matters helps: the pool approval is decided by the council or certifier, and the dividing fence question is decided between the owners or, failing that, by the tribunal.

Sources

General information only, current at 2026-09-22. Pool rules differ by state and by council, and penalty amounts are updated regularly. Confirm your own obligations with your council or a registered inspector before acting.

Thinking about a pool?

Compare quotes from builders who work in your postcode. One form, no obligation.

Get my quotes